As is often the case, some of the smallest of issues have been responsible for the greatest failures and tragedies – such as the lack of a bolt washer to a jet aircraft’s engine, or an O-ring for the space shuttle.  For fire protection systems, accumulated corrosion product has the potential to reduce or stop all water flow through the fire sprinkler heads; rendering it essentially useless in a time of greatest need.  Yet, far less corrosion product is required to alter the function of the valve providing water into the system in the first place.

For dry and pre-action fire systems, vastly complicated piping arrangements control the main water supply valve both to open and close.  This “trim” pipe is primarily small diameter 3/8 in. or 1/4 in. schedule 40 threaded galvanized steel pipe.  Aside from its small inside diameter, the galvanized steel pipe used in its assembly is the same lower quality galvanized steel so quickly failing at the much larger main supply runs.  When the smaller trim pipe corrodes, however, only a small volume of rust product is required to prevent proper functioning of the valve it controls.

First, the zinc protective finish to begin failing where it then creates what is called a “white rust” product.  This is generally not sufficient to produce an obstruction or failure, but once the zinc finish totally fails, much higher red rust corrosion activity appears at the carbon steel substrate below.  This produces much greater volumes of rust capable of obstructing orifices, interfering with solenoids, valves, etc.  Given that this issue is directly related to the corrosion resistance of the galvanized steel pipe, we find far few issues with much older systems.

Separately, and an almost equal threat, is where the trim pipe has been assembled on site, and where excess pipe thread sealant liquid or tape has created a similar threat.  Far less likely at pre-manufactured equipment, excess tape sealant wrapped beyond the first threads can be cut while assembled; the loose tape then capable of moving about during each flow test cycle.

 

[modula id=”27182″]

Condenser Water
Condenser Water
Chilled Water
Chilled Water
Dual Temperature
Dual Temperature
Fire Sprinkler - Wet
Fire Sprinkler - Wet
Fire Sprinkler - Dry & Pre-Action
Fire Sprinkler - Dry & Pre-Action
Copper Pipe Corrosion
Copper Pipe Corrosion
Galvanized Domestic Cold Water
Galvanized Domestic Cold Water
Galvanized Domestic Hot Water
Galvanized Domestic Hot Water
Sanitary Waste and Vent Piping
Sanitary Waste and Vent Piping
Steam and Steam Condensate
Steam and Steam Condensate
error: Content is protected !!